Frequently Asked Questions

Project Milestones

Project Launch June 2010
Tower 1 Completion June 2013
Tower 1 Turnover 3rd Quater of 2013
Tower 2 Launch Subject to Tower 1 Take-Up
Tower 2 Completion and Turn-over Subject to Tower 2 Launch
Amenity Completion 4th Quarter of 2013

Unit Deliverables

Deliverable Units Standard Finish
  • Units are telephone, cable and internet ready
  • All units are equipped with smoke detectors
Flooring
  • Units-Vinyl Planks
  • Toilet and Btach-Ceramic Tiles
  • Utility Area ( for 1 bedroom and 2 bedroom units) - Ceramic Tiles
Windows
  • Aluminum Windows
Walls
  • Unit Partitions-CHB Walls (painted)
  • Interior Partitions-Gypsum Board (painted)
  • Toilet and Bath-Ceramic Tiles and CHB (painted)
  • Utility Area-CHB Walls (painted)
Kitchen
  • Kitchen sink base
  • Complete Kitchen Fixtures
  • Kitchen Countertop: HPL
  • Overhead and Undersink Cabinets
  • Grease Trap
Toilet and Bath
  • Complete Toilet and Bath Fixtures
  • 2 Toilet and Bath Units for 2 Bedroom Units
Utility Area ( Laundry area )
  • For 1 Bedroom and 2 Bedroom Units Only



image
Amenities

1. Adult & Kiddie Swimming Pool
2. Clubhouse with Function Hall
3. Children's Play Area
4. Outdoor Gym
5. Garden Area (maximized green area and open spaces)

image
Building Features

1. Main lobby for each building
2. Three (3) elevator units
3. Admin room
4. Utility room
5. Emergency power
6. Garbage chute/room per level
7. Fire protection/fire alarm system
8. Mailbox per unit located at the lobby
9. Units are electricity, telephone, cable television & internet ready
10. Transformer Vault & Genset Room to be located at the ground floor level

Overview

  • Available:Tower 1
  • Size of unit:22.1 - 52.5 sqm
  • Sample Price:1.56 Million
  • Payment Terms: Please Inquire

Inquire Now

     
Name:
Email:
Location:
  Message:  
   
   


Contact Us

Phone :
Mobile :
Email :
johnpaul_johnvill@yahoo.com
Site :